Progressing

Outside, the garage now has its windows and the cladding is progressing. Inside the house, all the rooms have now had a couple of coats of paint, but as the floors are still covered up we have yet to see the full impact. However we have seen the shower room floor uncovered for the first time, which is a black limestone with the surplus tiles cut to produce a very neat skirting. The photo is of the basin on its birch stand.Shower RoomThe plumbers and electricians have also been back to do some commissioning, including testing the heating system for the first time.
The builders have recently see the need for the intricate insect mesh that was installed behind the wood cladding, as a swarm of wasps decided to make a home about 2m inside their long work bench in the photo. Not that I am a great one for killing wildlife, this was a case for Pestkill.Work Bench
Most things have gone smoothly with this build, except we have had a couple of teething problems this week. The shower-room light came with a diffracter that gives alternating dark and light bands around the room and a white garage door was delivered instead of the grey that was ordered.