Over the last couple of weeks, the groundworks team have leveled the back “lawn” and finished the drive. The drive has settled in well with the woodland with a covering of autumn leaves. Meanwhile, we have contributed by painting 3 sides of the garage, but are waiting for some more paint to finish it of.
I thought it was time for a photographic walk round the outside. So through the gate and pass the garage on the rightup to the front door.Around the East face
and around to the south.
Apart from some site tidying up and a couple of minor tweaks, we are now finished and plan to move in on the 7th November. So a big thank you to every-one in Mike’s team and to all the other people who have made our dream house possible.