The last few days have seen the scaffolding go up, which has given us our first indication of the height of the new house. The top boards are just below the roof at its low end on the left and a metre below at the high end.
Despite “Grand Designs” habitually having problems of windows arriving late, ours have arrived before the start of the build. However, as it was discovered that they were being transported on a large artic with no crane, they have been offloaded in Pershore and will stay there over Christmas awaiting a smaller lorry with a suitable crane.