Plastering

The main difference this week has been the plastering. The house is now fully plaster boarded and the skim plaster has been put on in the two upstairs bedrooms. A dark chocolate shade when first put on, drying to something lighter.Plastering On this photo you can see the detail around the window of the metal trim where it has not yet been skimmed.Plaster Detail
Also this week the solar panels have been connected so we can now make use of the energy which we are generating. Pity though that the Feed-in Tariff is a 1/3 of what it was at Christmas. And finally looking back over the photos, I notice that we have not had a long shot for a while. Rather too many buttercups but they do look pretty. Long Distance View